Solar EPC · Gujarat
Rooftop solar, engineered end to end.
Survey, design, installation, net-metering paperwork and maintenance — one team for the whole solar project.
Make an enquiryWhat we do
Clear services, stated plainly. No inflated claims, no pressure packages.
Site Survey & Design
Shadow analysis, load study and a generation estimate in writing.
Installation
Structure, panels, inverter and earthing, installed to standard.
Net Metering & Subsidy
Application, inspection and liaison handled for you.
Cleaning & AMC
Panel cleaning, health checks and generation monitoring.
Popular packages
Starting points most customers ask about. Final scope and price are confirmed in writing after we understand your need.
Residential Rooftop
For homes and societies
3-25 kW typicalCommercial & Industrial
For factories, schools and hospitals
25 kW and aboveIn pictures
The space, the work and the people — replace these with your own photos when the real business is ready.
Your first step
1. Send an enquiry with a few details · 2. We call back and discuss honestly · 3. You get a written scope / estimate before anything starts.
Questions people actually ask
How much does Site Survey & Design cost?
It depends on scope, so we confirm a written estimate after a short discussion — no prices invented on the spot, and no obligation to proceed.
How soon can we start?
After the enquiry call we agree a start date in writing. For Installation, we will tell you honestly if there is a waiting period instead of over-promising.
Do I need to prepare anything before the first visit?
Just bring any relevant details you already have — photos, measurements, reports or past bills, whichever applies to solar epc. We will tell you on the call if anything else is needed.
A note on this mockup: SuryaGrid Energy is a design mockup for a solar epc business in Rajkot. Names, photos and details are placeholders — the layout, copy style and enquiry flow are what you are reviewing.
Enquire
This is a mockup form — connect it to WhatsApp or email when the business details are final.